
Following a successful field trial on the Clair asset, BP have recently expanded the scope of our X-PAS solution.
OPEX are collaborating closely with the Clair asset team to maximise the value of their operational data to further improve the reliability and efficiency of their topside systems.
With an estimated seven to eight billion barrels of oil in place, the Clair field is the largest oilfield on the UK Continental Shelf. Production from the Clair field began in 2005 through the Clair Phase One platform which was the first fixed platform west of Shetland.
We look forward to further developing our relationship with BP.